K3 CAT Ski Resort | Revelstoke, BC, CA
The YANMAR CHP unit’s reliable power ensured that there was no need to install a diesel generator, as the CHP power units provided all the heat and power necessary. CHP technology is a more cost-effective option, as well as being a more environmentally conscious option. Project Overview K3 Cat Ski recently built an exclusive on-mountain lodge.…
Hyatt Place | Portland, ME
“We are proud to be the first hotel in the United States operating with YANMAR mCHP. The installed 10 kW system has lived up to its expected performance and savings, and has provided our facility with seamless operation.” – Hyatt Place Hotel Project Overview The Hyatt Place Hotel in Portland, Maine is a 130-room hotel,…
Historic Building Preservation
Project Overview Historic multi-story building located in downtown Dover, DE consisting of a large full-length basement (offices), 1st floor offices, conference rooms, libraries and 2nd floor offices for a total of 9,800 SF. The original building was built in 1850 as a residence with a more recent renovation of a basement with current construction standards.…
Gresham Place | Kitchener, ON
“Combined Heat and Power generation greatly benefits this large multi-residential community. Benefits for the landlord, residents and utility system include significantly lower utility costs, more secure power supply, potentially lower greenhouse gas emissions and an increase in overall efficiency. The financial incentives that were provided made this project possible, and we are excited to bring…
Green Metals | Woodstock, ON
“Green Metals has been extremely satisfied with the CHP unit from YANMAR. The smooth installation and trouble-free unit operation have definitely been a major positive. We have been able to enjoy significant energy savings providing a very attractive payback period as well. I would highly recommend YANMAR’s CHP units.” – Tim Cornel, General Manager, Green…
Forest Hill Public School | Kitchener, ON
“Forest Hill is highly committed to the environment. A few years ago, Forest Hill participated in the Schools in Bloom program. The school was evaluated on five dimensions of environmental awareness, commitment, and efficacy. Forest Hill for two years in a row attained the highest scores for schools in the ‘Over 400 Students’ category and was awarded the trophy…
Family Apartments | Mississauga, ON
“We just completed our first maintenance after running the YANMAR CHP system for 10 months straight. Our electric bill has been significantly reduced since installing YANMAR’s 35 kW unit, and we are very happy with the savings.” – Property Owner Project Overview This facility is an 11-story family-friendly apartment building located in Mississauga, Ontario. The…
Esther Barazzone Center | Chatham University
“The YANMAR CHP systems offer remarkably quiet operation, and are well designed. In the first year of operation, we have not experienced any operational issues.” – Jim Chorba | TUDI Mechanical Systems Project Overview The Esther Barazzone Center is the Commons Center for the Eden Hall Campus of Chatham University. Designed as a “living learning laboratory” this campus is…
Earls Fir Street Restaurant | Vancouver, BC
“The Yanmar gas-driven heat pumps were ideal when it came time to add air conditioning to our busy restaurant. They only require single-phase power to operate and use significantly less electricity than any other electrical heat pumps! Using natural-gas our operating costs is also much less and we understand that by using renewable natural gas, they would easily be…